Configuration Nothing here is deleted: a row that is switched off keeps its history, because proofs, lots and certificates already point at it.
Process types Stage order is what the ledger and the chain matcher reason with: an input may only back an output at the same or a later stage. Circular is narrower than terminal — incineration and landfill end the material without keeping it in the economy.
Code
Name
Phase
Stage
Sides
Order
Status
No process type defined.
Impact bonuses A bonus adds a percentage on top of the operator’s own price, and is paid only on the kilos where the impact was verified — ten tonnes of which six are sea-sourced earn it on six.
Impact
Bonus %
Status
No impact bonus defined.
Fees and reservations The reservation fee is coded and ships switched off, so the tile reports the switch rather than offering one that has nowhere to write.
—
Kolekt share of a sale
—
Agent share of the Kolekt fee
—
Reservation fee
—
Reservation hold, days
Reference lists The view shows active items only, so switching one off takes it out of this view as well as out of the dropdowns.
Key
Value
Order
Status
This list is empty.